A8 / APPLIANC
Challenge
A consumer appliance program needed sellable units eight weeks before its injection molds could be qualified. Redesigning the launch schedule around tooling would have missed the retail window.
Constraints
- Cosmetic A-surfaces adjacent to molded parts from the same SKU
- UL-adjacent flammability expectations for mains-powered devices
- Fixed per-unit cost ceiling for the pilot batch
Engineering approach
The enclosure set was re-nested for MJF with revised rib geometry to survive powder-bed production, vapor-smoothed and dyed to match the molded target finish. Assembly hardware and inserts were installed in-house so units arrived line-ready.
Results
- Pilot units shipped while tooling was still being cut
- Design feedback from the pilot led to two mold revisions before steel was finalized
- Bridge parts remained visually consistent with later molded production