Skip to content
additiv8by Idea8

Electronics

Enclosure validation for a connected sensor product

Six SLA enclosure revisions in four weeks resolved antenna keep-outs, gasket compression and serviceability before tooling release.

6 in 4 weeks

Revisions

0

Post-tooling changes

500+

Snap cycles tested

155.0A8 / SENSOR

Challenge

An IoT sensor enclosure had to reconcile RF performance, a compressible environmental gasket, and tool-free field service — three constraints that kept fighting each other in CAD reviews.

Constraints

  • Antenna keep-out zones restricted boss and rib placement
  • IP54 target with a printed TPU gasket
  • Snap-fit service access without visible seams

Engineering approach

Weekly SLA builds in ABS-like resin validated each constraint against physical hardware: RF range walks with the real board, gasket compression measurements, and repeated snap-fit cycling. The TPU gasket was printed in-house alongside each shell revision.

Results

  • Tooling released with zero post-release mold changes
  • Gasket geometry validated against compression targets before steel
  • Field-service snap detail survived cycle testing at revision 4
Upload a Part